Tuesday, 8 August 2017

KAOMBO - Loadout Block P5, P6 and P7










Sunday, 6 August 2017

BP Tangguh - Node - Calculation - Dimensional Control

Step by Step Node Calculation











Friday, 4 August 2017

Rhinoceros 3D : Cplane Origin, Rotate not all of view not effect/move

How to solve Cplane ,Origin, Rotate not all of view not effect/move
Rhino Option -- Click - Universal construction planes


 

Monday, 31 July 2017

Dimensional Control - Node BP Tangguh







Wednesday, 26 July 2017

Autodesk Navisworks - KAOMBO Projects

Autodesk Navisworks - KAOMBO Projects





Sunday, 23 July 2017

Angelyca Goes to Newspapaer Batampos 23 July 2017



Angelyca Goes to Newspapaer Batampos 23 July 2017








Sunday, 16 July 2017

Rhinoceros 3D --- Ball Pokemon



Just Fun !!!


Tuesday, 11 July 2017

SC4W -- Best Fit Circle

Step by step how to create best fit circle









Monday, 10 July 2017

Dimensional Control Surveyor Activities - Leg of Jacket - BP Tangguh Project

Dimensional Control - Measurement Fit Up & After Welding Leg of Jacket BP Tangguh Project 



Thursday, 22 June 2017

Dimensional Control Surveyor - Staff Reading






Saipem Karimun - Eni ships its first LNG cargo from Jangkrik

The 22,500 m3 cargo left the Bontang Liquefaction Plant, in East Kalimantan, and is headed to Bali, where it will be unloaded as part of a long-term LNG contract signed with PT Pertamina (PERSERO) in June 2015.
San Donato Milanese (Milan), 22 June 2017 – Eni carried out today its first shipment of liquefied natural gas (LNG) produced for the Indonesian domestic market by the Jangkrik field, which is located in Indonesia in deep water. The 22,500 m3 cargo left the Bontang Liquefaction Plant, in East Kalimantan, and is headed to Bali, where it will be unloaded as part of a long-term LNG contract signed with PT Pertamina (PERSERO) in June 2015.
Eni’s CEO Claudio Descalzi said: «Jangkrik is a project developed with an excellent time-to-market, started-up ahead of schedule, exploiting synergies with the existing Bontang terminal and other neighboring gas discoveries. These can be put into production within the existing value chain. I am very proud of my team and the relationships built on the base on these successes with Pertamina, the Authorities and all the stakeholders».
Eni started gas production at Jangkrik ahead of schedule on 15 May 2017. Gas produced is processed onboard the FPU ‘Jangkrik’ and then flows to the Onshore Receiving Facility. It then finally reaches the Bontang gas liquefaction plant through the East Kalimantan Transportation System. The LNG produced is sold under long-term contracts, partly to PT Pertamina and partly to Eni itself, which will sell it as part of the development of its international LNG portfolio, in line with the strategy announced in February.
Eni operates the Muara Bakau PSC in which it holds a 55% stake through its subsidiary Eni Muara Bakau BV The other PSC partners are ENGIE E&P (through its subsidiary GDF SUEZ Exploration Indonesia BV) with a 33.334% stake and PT. Saka Energi Muara Bakau with an 11.666% stake. All activities are carried out in coordination with SKK Migas, the entity representing the Government of Indonesia.
Eni has been operating in Indonesia since 2001 and currently has a large asset portfolio across exploration, production and development. Production activities are located in the Mahakam River delta, East Kalimantan, through  VICO Ltd, a joint venture between Eni (50% stake), which is the operator, and Saka Energi (50% stake). VICO Ltd, which is party to the Sanga Sanga PSC, produces on average 20,000 barrels of oil equivalent per day




* Shipped on Thursday its first LNG cargo from Indonesia's Jangkrik field
* The 22,500 cubic metre cargo left the Bontang liquefaction plant, in East Kalimantan, and is headed to Bali
 * Eni started gas production at Jangkrik ahead of schedule on 15 May 2017 Further company coverage




Reference : https://www.eni.com/en_IT/media/2017/06/eni-ships-its-first-lng-cargo-from-jangkrik

Wednesday, 21 June 2017

Tanjung Balai Karimun - Lampu Colok





 

 
 

Desa : Sungai Ayam

Desa : Tebing






 

Fast-breaking Saipem Management vs IKM (Ikatan Keluarga Muslim) Karyawan Saipem



Fast-breaking Saipem Management vs IKM (Ikatan Keluarga Muslim) Saipem Employee vs Orphan children


 

 

 
 
 

Monday, 19 June 2017

Dimensional Control Surveyor - Marking Leg of tubular



Step by step how to reference line from center of tubular

1. Ensure format GSI is gsi16_mik.FRT



2. Export to TopKo Software



3. Calcolo for getting center of circle 1 & 2



4. Input data calculate center of ID into Instruments Leica



4. Click program - reference line


5. Create Job Name


6. Stake to line


7. Calculate reference line


8. View start to work survey


9. Marking surveyor